4 panel wood screw space according to recommended fastening pattern and local codes.
Westman steel roofing installation guide.
Screw length is to be long enough to penetrate the decking.
Other wall trims and flashings step 8.
Material checklist step 2.
Clean sheets of any debris before installation.
All products offer advanced benefits such as long service lives easy installation and little maintenance over traditional roofing materials.
Always begin working at the point with the longest peak to eave distance.
Take care the first piece is aligned precisely perpendicular square to the edge.
Accurately measure the roof and create a roof plan for estimating and ordering roof panels and accessories ensure all required roof penetrations are in place before beginning pluming vents exhaust attic venting etc remove any dirt or debris from.
Use a circular saw with a fine tooth blade at a high speed but a low advance rate to cut 3 4 sheets at a time.
Underlayment is to be installed over the eave starter.
Wall sheeting step 9.
Fasten valley in place with clips and fasteners on the outer edge of the valley every 16 on center.
Install base flashing step 7.
Installation guide important notes.
Installation consists of the following steps.
Notch hem of top valley and overlap valley 4 and put 2 rows of sealant between overlap.
Simply choose the installation guides appropriate for your project.
Store sheets in a cool and dry place out of direct sunlight.
3 roofing panel install with lower edge overhanging eave edge by at least 1.
5 outside closure install along upper edge of panels about 2 below the edge.
Add the metal panels.
From basic sheet steel cladding to snaplok roofing panels and on to more sophisticated steel shingles with stone coating and even steel spanish tiles.
Roof sheets step 4.
Install ridge cap step 5.
For curved cutting use a jigsaw or metal cutting shears.
Begin installation on side away from wind rain direction.
Stack short sheets on top of longer ones.
Installation guide handling.
Install eave starter at all eaves.
During cutting secure sheets to ensure clean cuts.
Fasten eave starter with 10 x 1 long galvanized zip screws 12 o c.
Install roof trim flashing and westman steel underlayment step 3.
When installing roofing panels take care to avoid walking on the butt of the panels.
To prevent solar heat buildup avoid covering the stack of sheets with a dark tarp or other heat absorbing material.
Trim the bottom of the valley to the correct angle and allow 5 8 to bend around the eave starter.
Drive through the outside closure and the ribs of the panel beneath.