How to install a basic sliding tub shower door.
What do i need to install a shower door.
Then apply a thin line of caulk along the metal threshold and press it firmly onto the tub.
Next pre drill holes into the tiled walls and hammer in the plastic wall anchors to hold the side columns in place.
Let professional independent installers handle glass shower door installation for you.
The design of your tub or shower may mean increased costs as well.
How to install a basic sliding tub shower door.
In this video i show installing a frameless shower door enclosure.
Shower door overview illustration by gregory nemec.
However the actual installation of your new shower door can be completed by our professional installers in 2 3 hours.
Any wall that s more than inch out of vertical over 5 feet will need a matching filler strip so that the door can be made plumb.
Don t fret about shower door replacement.
Planning ahead measure the width of the shower opening in at least three places.
Learning how to install a shower door is simply a matter of the right tools and good technique.
Hanging the door panels.
It was actually kind of a random thing.
Installing a shower door.
For example it s more complicated to install shower doors on top of a bathtub than to put simple sliding doors on a shower stall.
Place the rollers on the top frame flange of both door panels and secure them with lock washers and machine screws.
For the frame you ll need to install tracks at the bottom sides and top of your shower opening using sealant and screws.
Threshold up to 5 feet and halfway in between.
Prepare the doors by installing roller and if applicable handle towel bar hardware.
Most pivot doors are designed to be reversible and can be installed with the pivots on the right or left side of the enclosure.
How to install a frameless shower door.
Installing a shower door is usually a very straightforward project.
To install a shower door start by marking the points on the wall where the door frame will be attached.
Our shower doors are customized for your space so having a new one ordered fabricated and delivered could take up to 3 weeks.
Installing the door panels is easiest from outside the shower.